Factory Cheap Hot Lifting Black Finished Chain – NACM2010 GRADE 100 ALLOY CHAIN – Rudong
Factory Cheap Hot Lifting Black Finished Chain – NACM2010 GRADE 100 ALLOY CHAIN – Rudong Detail:

|
Nominal Chain Size |
Material Diameter |
Working Load Limit(Max.) |
Proof Test (Min.) |
Min. Breaking Force |
Inside Length (Max.) |
Inside Width Range |
|||||||
|
in |
mm |
in |
mm |
lbs |
kg |
lbs |
kN |
lbs |
kN |
in |
mm |
in |
mm |
|
7/32 |
5.5 |
0.217 |
5.5 |
2,700 |
1,220 |
5,400 |
23.8 |
10,800 |
47.6 |
0.7 |
17.6 |
0.281-0.325 |
7.14-8.25 |
|
9/32 |
7.0 |
0.276 |
7.0 |
4,300 |
1,950 |
8,600 |
38.5 |
17,200 |
77.0 |
0.9 |
22.9 |
0.281-0.430 |
9.53-10.92 |
|
5/16 |
8.0 |
0.315 |
8.0 |
5,700 |
2,600 |
11,400 |
51.0 |
22,800 |
102.0 |
1.0 |
26.4 |
0.430-0.500 |
10.92-12.70 |
|
3/8 |
10.0 |
0.394 |
10.0 |
8,800 |
4,000 |
17,600 |
79.0 |
35,200 |
158.0 |
1.3 |
32.0 |
0.512-0.600 |
13.00-15.20 |
|
1/2 |
13.0 |
0.512 |
13.0 |
15,000 |
6,800 |
30,000 |
134.0 |
60,000 |
268.0 |
1.6 |
41.6 |
0.688-0.768 |
17.48-19.50 |
|
5/8 |
16.0 |
0.630 |
16.0 |
22,600 |
10,300 |
45,200 |
201.0 |
90,400 |
402.0 |
2.0 |
51.2 |
0.812-0.945 |
20.63-24.00 |
|
3/4 |
20.0 |
0.787 |
20.0 |
35,300 |
16,000 |
70,600 |
315.0 |
141,200 |
630.0 |
2.5 |
64.0 |
0.964-1.180 |
25.00-30.00 |
|
7/8 |
22.0 |
0.866 |
22.0 |
42,700 |
19,400 |
85,400 |
381.0 |
170,800 |
762.0 |
2.8 |
70.4 |
1.080-1.300 |
27.50-33.00 |
Product detail pictures:

Related Product Guide:
We depend on sturdy technical force and continually create sophisticated technologies to meet the demand of Factory Cheap Hot Lifting Black Finished Chain – NACM2010 GRADE 100 ALLOY CHAIN – Rudong, The product will supply to all over the world, such as: kazan , Estonia , South Korea , Our advanced equipment, excellent quality management, research and development ability make our price down. The price we offering may not be the lowest, but we guarantee it is absolutely competitive! Welcome to contact us immediately for future business relationship and mutual success!
This company can be well to meet our needs on product quantity and delivery time, so we always choose them when we have procurement requirements.





